Homeworks - Job "D"
For our forth movie, the client wanted to re-vamp their existing Bathroom.
The client wanted to remove the Bath and have a stand alone "heating" shower unit.
Click the following link to view movie of "Homeworks Job D Before"
JOB D BEFORE
...(it will open in a new browser window, give it time to load, then play it in full)
So, In their new Bathroom, we fitted the following.......
A 900mm Chrome Quadrant shower enclosure with a Chrome Triton T-90 "heating" shower unit.
Because of the oversized boxing covering the toilet 4" waste, we moved the toilet to the external wall.
A Wall Hung sink was fitted in the alcove with mirror and lights.
Top flush toilet / Chrome Spot lights / Fully tiled Porcelain walls and floor with two horizontal borders.
Click the following link to view the movie of "Homeworks Job D Done"
JOB D DONE
....(it will open in a new browser window, give it time to load, then play it in full)