Homeworks - Job "A"
For our First movie, we have chosen a job where the client wanted to have a new jacuzzi .
The client also hoped to have a separate, stand alone, "pumping" shower unit.
Unfortunately, there was not enough room in the existing Bathroom ..... so we looked to the empty Spare Room !
Click the following link to view movie of "Homeworks Job A Before"
JOB A BEFORE
...(it will open in a new browser window, give it time to load, then play it in full)
So, In the Spare Room we fitted the following.......
1800mm x 800mm Jacuzzi with LED lights / 900mm Chrome Quadrant shower enclosure with a Triton Pump shower AS2000.
Walnut sink unit / Top flush toilet / Wall to wall mirror / Underfloor heating / Chrome Spot lights.
To help fill the new Jacuzzi, we fitted a bigger 48"x18" Pre-insulated Immersion tank and 24hr timer.
The "old" bathroom was stripped and re-plastered / extra sockets and spot lights were fitted.
The client will later use this as a Computer Room / Office.
Click the following link to view the movie of "Homeworks Job A Done"
JOB A DONE
....(it will open in a new browser window, give it time to load, then play it in full)